Project 05
Occupied renovation.
Operational record. Renovation executed while maintaining occupant function, safety, and cleanliness.
Context
Renovation performed with active occupancy. Priority was stability: controlled access, dust/noise mitigation, and predictable daily conditions.
Scope
- Zone planning and temporary protections (barriers, negative air where required).
- Phased demo/rough-in/finish by area to preserve function.
- Progressive punch and staged handoffs to reduce disruption.
Constraints
- Occupant schedule, access windows, and safety segregation.
- Dust, odor, and noise control as a first-order requirement.
- Temporary services/continuity planning (power, lighting, egress).
Duration
Phased by zones with clear release criteria per zone (prep → rough-in verified → substrate accepted → finishes).
Mid-build changes
- Phasing revision due to occupancy needs — sequence updated to preserve critical areas.
- Hidden condition in substrate/walls — scope documented, remediation added, and timing adjusted.
Final outcome
Work completed without uncontrolled disruption; areas returned to service progressively with documented closeout per zone.