Project 04

Specialty systems integration.

Operational record. Specialty work (ceilings/lighting/epoxy) integrated into broader GC sequence without trade conflicts.

Context

Specialty scope executed as part of a larger sequence. Outcome depended on substrate readiness, coordination, and protection discipline.

Scope
  • Substrate prep verification and acceptance before specialty install.
  • Specialty install (systems) coordinated with adjacent trades.
  • Protection and staged handover to prevent damage post-install.
Constraints
  • Substrate tolerances and environmental conditions must be met prior to install.
  • Interfaces with other trades; sequencing and access coordination.
  • Protection of finished work; no uncontrolled follow-on traffic.
Duration

Locked behind readiness gates (substrate → environment → access) then executed with controlled handoff timing to protect finished surfaces.

Mid-build changes
  • Sequencing change due to upstream delay — re-coordinated to preserve quality.
  • Spec adjustment — documented approval and updated install approach.
Final outcome

Installed system performs as intended with documented acceptance criteria met and closeout notes retained.